1. Overview

The Manufacturing module plans and executes production: plant master data, BOMs and routings, MPS/MRP planning, shop-floor orders, inventory issues/receipts, batch traceability, optional QC/packaging/pharma controls, and production costing posted to Finance.

Area Capabilities
Structure Plants, lines, work centers, machines
Engineering BOMs, routings, packaging BOMs
Planning Demands, production plans (MPS/MRP), schedules
Execution Production orders, operations, material issues, outputs
Quality Inspection plans/requests, quarantine
Traceability Batch lots, genealogy, recalls
Costing Production costs and variances
Insights Dashboard and manufacturing reports
flowchart LR Eng[BOM and Routing] --> Plan[MPS / MRP] Plan --> PO[Production order] PO --> Issue[Material issue] Issue --> Ops[Operations] Ops --> Out[Output receipt] Out --> QC[Quality optional] QC --> Cost[Costing optional]

Feature flags in manufacturing settings typically control Quality, Quarantine-on-QC, Packaging, Pharmaceutical extension, and Costing.


2. Getting started

2.1 Recommended setup order

flowchart TD A[Inventory items and warehouses] --> B[Finance accounts if costing] B --> C[Enable manufacturing settings] C --> D[Plants lines work centers machines] D --> E[Approve BOMs and routings] E --> F[Optional QC packaging plans] F --> G[Demands and production plans] G --> H[Generate and execute orders]
  1. Ensure Inventory items, UoMs, and warehouses exist.
  2. If costing is used, align Finance accounts with manufacturing cost settings.
  3. Enable Quality / Packaging / Pharma / Costing as needed.
  4. Build plant hierarchy.
  5. Create and approve BOMs and routings.
  6. Configure inspection plans and packaging BOMs if enabled.
  7. Enter demands, run plans/MRP, generate orders.
  8. Execute shop floor and close/cost as required.

2.2 Main navigation

Menu Path Purpose
Dashboard /manufacturing/dashboard KPIs and queues
Plants / Lines / Work centers / Machines /manufacturing/plants … Structure
Bill of materials /manufacturing/boms Product BOMs
Routings /manufacturing/routings Process routes
Production demands /manufacturing/production-demands Demand intake
Production plans /manufacturing/production-plans MPS/MRP
Production orders /manufacturing/production-orders Shop orders
Material issues /manufacturing/material-issues Component issues
Production outputs /manufacturing/production-outputs FG receipts
Batch / Lots /manufacturing/batch-lots Lot masters
Traceability /manufacturing/traceability Genealogy
Inspection plans / requests /manufacturing/inspection-* QC
Packaging BOMs / orders /manufacturing/packaging-* Packaging
Product recalls /manufacturing/product-recalls Recalls
Production costs / variances /manufacturing/production-costs … Costing
Reports /manufacturing/reports Report hub
User guide /manufacturing/user-guide In-app guide

3. Plant hierarchy

Entity Parent Notes
Plant — Code, name, address, active
Production line Plant Capacity, efficiency; status Active / Inactive / Maintenance
Work center Line Type, capacity, operating cost per hour
Machine Work center Capacity, cost rate, status Active / Inactive / Maintenance / Calibration due

Routings reference work centers/machines; scheduling uses line capacity; the dashboard can filter by plant and line.


4. BOMs and routings

Manufacturing BOM

Versioned bill of materials for a finished item.

Concept Detail
Lines Component, quantity, scrap %, variance %, phantom, optional routing sequence
Approval Draft → Approved → Obsolete
Tools New version, explode, compare, where-used

Approve requires at least one line. Approving a version typically obsoletes prior approved versions of the same BOM number. Components must be valid Inventory items.

Routing

Versioned process route with operations: sequence, work center, machine, setup/run time, labor/machine flags, scrap %, quality checkpoint. Approval uses the same Draft → Approved → Obsolete pattern and requires at least one operation.

Packaging BOM

When packaging is enabled: Draft → Active → Inactive. Lines include packaging components (and label flags). Used to create packaging orders from production.

flowchart TD A[Create BOM Draft] --> B[Add component lines] B --> C[Approve] D[Create Routing Draft] --> E[Add operations] E --> F[Approve] C --> G[Ready for production orders] F --> G

5. Planning

Production demands

Sources: Manual, Sales, Forecast. Manual CRUD plus Import from Sales for open sales demand (skips duplicates).

Production plans (MPS/MRP)

Status Meaning
Draft Editable
Confirmed Ready for MRP
MrpCompleted Requirements generated
Closed Finished plan (domain support; confirm UI/API exposure in your build)
flowchart TD A[Create plan with lines] --> B[Confirm] B --> C[Run MRP] C --> D[MrpCompleted] D --> E[Generate suggested orders] D --> F[Generate purchase requisitions] D --> G[Generate schedule]

MRP requirements use actions such as Produce or Purchase. Generated production orders often start as Planned. Schedules are managed mainly from the plan detail screen (Scheduled / Confirmed / Cancelled entries).


6. Production orders

Statuses

Status Meaning
Draft New
Planned From planning
Approved Engineering OK
MaterialsRequested Released for issue
MaterialsIssued Components issued
InProduction Operations running
PartiallyCompleted Some ops done
ProductionCompleted Ops finished
QualityPending Awaiting QC
Released QC released / available
Closed Finished
Cancelled Abandoned

Key actions

Action Effect
Approve Draft/Planned → Approved (requires approved BOM and routing when assigned)
Release Approved → MaterialsRequested; copies routing into order operations
Execute / change status Moves through materials, production, QC, release, close per allowed transitions
Edit / Delete Edit Draft/Planned; delete Draft only
flowchart TD A[Draft or Planned] --> B[Approve] B --> C[Release] C --> D[MaterialsRequested] D --> E[Issue materials] E --> F[MaterialsIssued] F --> G[Run operations] G --> H[ProductionCompleted] H --> I{Quality enabled} I -->|Yes| J[QualityPending] I -->|No| K[Released] J --> K K --> L[Closed]

Parent/child orders support multi-level assemblies from MRP.

Operations

Operation statuses: Pending → Running ↔ Paused → Completed | Skipped.
Starting the first operation can move the order to InProduction. Completing all operations moves toward ProductionCompleted (or PartiallyCompleted if some remain). Scrap can be recorded as material, product, or operation scrap.


7. Material issues and outputs

Material issues

Status Meaning
Draft Prepared
Issued Posted to Inventory ISSUE
PartiallyReturned / Returned Unused returned via ISSUINGRETURN
Cancelled Abandoned

Create when the order is Approved or MaterialsRequested. Create from BOM scales components by planned quantity and scrap %. Issue checks stock, posts Inventory ISSUE, moves the order to MaterialsIssued, and supports batch/traceability logging.

Production outputs

Status Meaning
Draft Prepared
Posted Inventory RECEIPT
Cancelled Abandoned

Create/post when the order is in production or completed. Posting receipts finished goods, updates genealogy, and if Quality is enabled may set QualityPending and create inspection (and quarantine when configured). Otherwise a completed order may move to Released.

flowchart TD A[Material Issue Draft] --> B[Issue] B --> C[Inventory ISSUE] D[Output Draft] --> E[Post] E --> F[Inventory RECEIPT]

8. Packaging

When packaging is enabled:

  1. Activate a packaging BOM.
  2. Create a packaging order (optionally from a production order).
  3. Issue materials → Start → Complete (receipt finished packaging qty; track reject/waste).

Statuses: Draft → MaterialsIssued → InProgress → Completed | Cancelled.


9. Batches, quarantine, and traceability

Batch lots

Statuses: Open, Closed, Quarantined. Create or generate for an order; optional serials. Lots are often auto-ensured on issue/output. Closing is blocked while quarantined.

Quarantine

Statuses: Active, Released, Rejected. Can be auto-created when QC holds output. Release can free the order; Reject can cancel the linked order. Quarantine management is primarily API/permission-based (dashboard may show active count).

Traceability

Link types such as Consumed in, Produced from, Parent of, Derived from. Use backward/forward batch inquiry and order genealogy; manual links can be added.


10. Quality

Inspection plans

Draft → Active → Inactive. Plans define checks (min/max/expected values).

Inspection requests

Pending → InProgress → Completed | Cancelled.
Results: Pending / Pass / Fail / Conditional pass.
Decisions: Release, Reject, Rework, Hold.

Completing with Release typically sets the order to Released (and releases quarantine). Reject cancels the order. Rework returns to InProduction. Hold keeps QualityPending. You generally cannot Release if any check Failed.

flowchart TD A[Output posted with QC] --> B[Inspection InProgress] B --> C{Decision} C -->|Release| D[Order Released] C -->|Reject| E[Order Cancelled] C -->|Rework| F[Order InProduction] C -->|Hold| G[QualityPending]

11. Costing

When costing is enabled:

Status Meaning
Draft Not calculated
Calculated Costs computed
Posted Posted to Finance GL

Cost elements: Material, Labor, Overhead, Scrap. Variances: Material, Labor, Overhead, Total.

Calculate uses issued materials, operation labor rates, and overhead settings. Post to GL creates a Finance journal (and optional variance accounts) using configured account codes.

Manufacturing costing is separate from the Cost Accounting module; organizations should avoid inconsistent dual posting.


12. Pharmaceutical extensions

When the pharmaceutical extension is enabled:

Feature Notes
Product recalls Draft → Active → Closed (menu available)
Batch destruction Pending → Completed / Cancelled (API-oriented)
Controlled material usage Logging on issues when pharma is on

Treat destruction/controlled logs as compliance records; confirm inventory impact in your process.


13. Dashboard and reports

Dashboard

Order counts (active/completed/cancelled), yield and scrap, issues/outputs, status breakdown, trends, top lines, pending inspections, active quarantines, cost/variance summary. Filters: date, plant, line.

Reports hub

Production orders, scrap, quality, cost variances, line utilization.


14. Permissions summary

Permission group: Manufacturing.

Area Key abilities
Plants / Lines / Work centers / Machines CRUD
BOMs / Routings CRUD, Approve
Demands CRUD, Import from Sales
Plans CRUD, Confirm, Run MRP, Generate orders, Generate PRs
Schedules CRUD
Production orders CRUD, Approve, Release, Execute, Close
Material issues CRUD, Issue, Return
Outputs CRUD, Post
Batch lots CRUD, Generate, Close
Traceability View, Create link
Inspection plans/requests CRUD/Activate; Record results; Complete
Quarantine Create, Release, Reject
Packaging Activate BOM; Issue/Execute/Complete orders
Pharma Recalls, destructions, controlled materials
Costs Calculate, Post to GL
Dashboard / Reports / Variances Access

15. Integration with other modules

flowchart TB Sales[Sales demands] --> Mfg[Manufacturing] Mfg -->|ISSUE / RECEIPT| Inv[Inventory] Mfg -->|Production cost JE| Fin[Finance] Mfg -->|Purchase requisitions| Pur[Purchasing] CA[Cost Accounting] -.->|Separate costing model| Mfg
Module Relationship
Inventory Item validation, availability, ISSUE / return / RECEIPT postings
Finance Production cost journal posting
Sales Import production demands
Purchasing Generate purchase requisitions from MRP purchase actions
Cost Accounting No direct coupling; parallel costing if both are used

Appendix A — Quick procedures

A.1 Engineer a product

  1. Create plant hierarchy.
  2. Create BOM with components → Approve.
  3. Create routing with operations → Approve.

A.2 Plan and generate orders

  1. Enter or import demands.
  2. Create plan → Confirm → Run MRP.
  3. Generate orders / PRs / schedule as needed.
  4. Approve and Release production orders.

A.3 Run the shop floor

  1. Create material issue (from BOM if possible) → Issue.
  2. Start and complete operations.
  3. Create output → Post.
  4. Complete QC if required → Release.
  5. Calculate and post production cost if enabled.
  6. Close the order.

A.4 Package finished goods

  1. Activate packaging BOM.
  2. Create packaging order → Issue materials → Start → Complete.

Appendix B — Operating notes

Topic Guidance
Settings gates Quality, packaging, pharma, and costing features must be enabled to use those screens
Quarantine UI May be API/dashboard-only; still part of QC hold path
Plan close Confirm whether Close is exposed in your UI build
Dual costing Prefer one costing post path (Manufacturing vs Cost Accounting)
Schedules Managed from production plan detail

Appendix C — Document control

Item Value
Title Manufacturing Module User Guide
Source of truth modules/manufacturing and frontend/src/app/modules/manufacturing